1比1现金棋牌

| Join the desktop | Mobile version | No picture
Advanced Search
Ranking promotion
Ranking promotion
release news
release news
Member Centre
Member Centre

Supply high temperature oil pump

Click image to view original
Brand: Hengyi
model: KCG6-0.6
specification: G1.5
unit price: 550.00 yuan / set
Order: 1 set
Total Supply: 500 units
Delivery period: 天内发货 Shipped within 1 day from buyer's payment
location: Cangzhou City, Hebei Province
Valid until: long term effective
latest update: 2018-09-13
Views: 1190
Inquiry
Basic company information
Product details
Supply high temperature oil pump
● Scope of use
KCG high temperature gear oil pump is suitable for conveying non-corrosive high temperature liquid without solid particles and fibers. The medium temperature can reach 250 ℃ and the viscosity is 5-1500cst.
● Use
Plastic and rubber processing industry, textile printing and dyeing industry, coating industry, wood processing industry, food industry, paper printing and other liquid heat carrier heating and other industries.
● Structural features
This series of high-temperature gear oil pumps are composed of gears, shafts, pump body pump covers, shaft end seals and other parts. All parts are made of suitable temperature-resistant materials. The running parts in the pump are lubricated with the medium they transport.
KCG, 2CG high temperature gear oil pumps are equipped with safety valves to prevent damage to the pump and motor due to overload.

● [Installation sequence]:

1. During installation, in order to prevent sundries from falling into the machine, all holes of the unit should be covered.

2. After connecting the pipeline and determining the direction of rotation of the motor, connect the coupling and check the concentricity of the shaft again.

3. Correct the concentricity of the pump shaft and the motor shaft, and allow a deviation of 0.1 mm on the outer circle of the coupling road; the gap between the two coupling planes should be guaranteed to be 2 to 4 mm, and (the small pump takes a small value) the gap should be uniform. The tolerance is 0.3 mm.

4. Place the unit on the foundation with buried anchor bolts. Between the base and the foundation, use a pair of wedge pads for correction.

5. In order to prevent sundries in the pipeline from entering the pump, for newly installed pipelines, a filter should be installed in the pump glue, and its effective cross-section should be greater than 2 to 3 times the cross-section of the suction pipe.

6. Loosen the coupling shaft and place it on the pump shaft and the base with a spirit level. Adjust the level of the unit by adjusting the wedge pads and tighten the anchor bolts appropriately to prevent walking.

7. After the unit's actual test run for 2 to 3 hours, make a final inspection. If there is no adverse phenomenon, the installation is considered to be qualified.
● [Caution]
1. Before starting, check whether the pump shaft rotates flexibly, whether there is jamming, whether the valves on the inlet and outlet pipes are open, and whether the pump rotation direction is correct.

2. Before starting the pump that has not been used for a long time, a certain amount of lubricating fluid should be injected into the pump cavity to reduce the dry friction of the pump during the suction process and improve the self-priming performance of the pump.

3. If there is abnormal noise or overheating after turning on the machine, stop the machine and check immediately.

4. Check for leaks at the pump shaft end. For example, the packing seal should be properly tightened, and the other seals should be disassembled for inspection.

5. If hot oil is delivered, it should be preheated evenly when driving. The preheating is carried out continuously through the pump body with the medium being transported.

6. When the pump is stopped, first cut off the power, and then close the valve on the inlet and outlet pipes to avoid causing the pump to reverse.
● [After-sales commitment]:

1. The warranty period is one year. The warranty period is a product processing and manufacturing quality problem. The company implements the "three guarantees", that is, return, replacement, and repair.

2. For pumps used in engineering projects, personnel can be dispatched to cooperate with the buyer to guide installation and commissioning, as well as perform related service work.

3. Supply spare parts in a timely manner at a reasonable parity price to ensure universal interchangeability of spare parts.

4. If the product has quality problems or the user needs service, it is guaranteed to arrive on-site service within 72 hours (24 hours in special cases).

5. When the user's one-time usage is large, the prototype can be provided for payment after passing the trial.

6. The products sold by our company have a lifetime warranty.

【Product Image】:

条[查看全部]相关评论 A total of 0 [View All] Related Comments
本企业其它产品 More .. Other products of this company

[ Supply Search ] [ [ Tell a friend ] [ Print this article ] [ Close window ]

contract
  • Telephone consultation

  • 185533186484